Industry Testing & Training
Test, train, develop on the UK's only double-track railway
The Great Central Railway offers unmatched facilities for railway testing, development, and training on the UK’s only double-track heritage railway. With short-notice availability, cost-effective pricing, and comprehensive infrastructure, we provide a seamless alternative to the national network for vehicle testing, equipment trials, and staff training.
Why Choose the GCR?
Main Line Environment
- 8-mile mainline (6 miles double track) with absolute block signalling
- Speeds up to 75mph for diesel & hybrid, 60mph for steam
- 25-ton axle loading, gentle gradients, and a mix of curves and straight sections
- Separate 1-mile branch line with tighter curves and steeper gradients
Vehicle & Equipment Testing
Testing
- Locomotive testing for diesel, hybrid, steam, and yellow plant
- Speeds up to 75mph for diesel & hybrid, 60mph for steam
- Infrastructure & component testing, including mechanisms and signaling, brake and axle monitoring, emissions, noise, and vibration assessments
- Secure testing environment with undercover storage and concealed sidings
Driver & Industry Training
- Train-the-trainer and driver training programs for rail professionals
- Specialized training for emergency services & armed forces
- 25-ton axle loading, gentle gradients, and a mix of curves and straight sections
Comprehensive On-Site Facilities
On-Site Facilties
- Fully equipped locomotive & carriage works with pits and rope access
- 60-foot (18.2m) turntable
- Secure vehicle storage (four-road, 430ft-long shed (131m))
- Dedicated road/rail transfer siding for easy vehicle unloading
- High-quality on-train catering (including Pullman train and Inspection Saloon) for product launches or client events
Proven Industry Experience
We have worked with Network Rail, SERCO, EWS (now DB Cargo UK), Mercedes-Benz, Wabtec, Porterbrook, and Angel Trains on projects ranging from hybrid multiple unit development to braking and acceleration trials.
“It was reassuring to deal with people who consistently demonstrated a ‘can-do’ approach.” – Network Rail
Book Your Testing or Training Session
Book your Testing
Our flexible scheduling allows daytime or nighttime bookings, with the option for exclusive track possession. To find our more please contact our Head of Infrastructure on: