Industry Testing & Training
Test, train, develop on the UK's only double-track railway
The Great Central Railway offers unmatched facilities for railway testing, development, and training on the UK’s only double-track heritage railway. With short-notice availability, cost-effective pricing, and comprehensive infrastructure, we provide a seamless alternative to the national network for vehicle testing, equipment trials, and staff training.
Why Choose the GCR?
Main Line Environment
- 8-mile mainline (6 miles double track) with absolute block signalling
- Speeds up to 75mph for diesel & hybrid, 60mph for steam
- 25-ton axle loading, gentle gradients, and a mix of curves and straight sections
- Separate 1-mile branch line with tighter curves and steeper gradients
Vehicle & Equipment Testing
Testing
- Locomotive testing for diesel, hybrid, steam, and yellow plant
- Speeds up to 75mph for diesel & hybrid, 60mph for steam
- Infrastructure & component testing, including mechanisms and signalling, brake and axle monitoring, emissions, noise, and vibration assessments
- Secure testing environment with undercover storage and concealed sidings
Driver & Industry Training
- Train-the-trainer and driver training programs for rail professionals
- Specialized training for emergency services & armed forces
- 25-ton axle loading, gentle gradients, and a mix of curves and straight sections
Comprehensive On-Site Facilities
On-Site Facilties
- Fully equipped locomotive & carriage works with pits and rope access
- 60-foot (18.2m) turntable
- Secure vehicle storage (four-road, 430ft-long shed (131m))
- Dedicated road/rail transfer siding for easy vehicle unloading
- High-quality on-train catering (including Pullman train and Inspection Saloon) for product launches or client events
Proven Industry Experience
We have worked with Network Rail, SERCO, EWS (now DB Cargo UK), Mercedes-Benz, Wabtec, Porterbrook, and Angel Trains on projects ranging from hybrid multiple unit development to braking and acceleration trials.
“It was reassuring to deal with people who consistently demonstrated a ‘can-do’ approach.” – Network Rail
Further Information & Enquiries
Book your Testing
Our flexible scheduling allows daytime or nighttime bookings, with the option for exclusive track possession. To find our more please contact our Head of Infrastructure on: